Peljesac Bridge works progressing well
According to yesterday’s Slobodna Dalmacija, works on Peljesac Bridge are progressing well.
Click here to read the article + check other news posts about Peljesac Bridge
Post Info: Posted on Tuesday, January 27th, 2009 , filed under Uncategorized.
Previous Post: Small Palm Trees in Sveti Nikola »
Next Post: Another Sea Turtle saved »
Previous Post: Small Palm Trees in Sveti Nikola »
Next Post: Another Sea Turtle saved »
Read More
Related Reading:
Latest Posts:

July 24th, 2009 11:05
Dear Honorable Sir
Always thank you very much for kindly inform us the EPC Contractor for Peljesac Bridge project in Coratia.
We are a famous make for piling pipe for Peljesac Bridge project.
http://www.jnseoplant.com
MOB:0086-13801802240
msn;jsneoplant@example.com
TEL:+0086-21-5422-0689.
Looking forward to getting information of EPC Contractor for Peljesac Bridge project.
Kind regards
Charles,Kim
July 24th, 2009 20:17
Hey, what’s going on with your stupid bridge?
. The Croatian gov’t announce yesterday that it was “postponing” the construction (i.e. the project is dead). Did you guys get scared by Bosnia’s threat to sue from two months ago? Go build a bridge in your own backyard, silly
.
August 6th, 2009 20:59
Why not build a cheap floating bridge? Then it can be sold off and towed away once Croatia and Bosnia are in the EU, ie once transit rights are secured.
November 4th, 2009 16:52
Peljesac Bridge project slowing down
Building of the Peljesac Bridge in southern Croatia has been slowed down due to the recession, Minister of the Sea, Transport and Infrastructure Bozidar Kalmeta has said.
He said today (Tues) the bridge that will connect the mainland and the peninsula of Peljesac would be completed by the year 2015, the news website Dubrovniknet has reported.
Peljesac Bridge, which at 2,374 metres in length will be the second longest in Europe,
will be four lanes wide.