Archive for the 'Peljesac' Category

Peljesac Bridge will not be scrapped

Some good and reassuring news are comming from Croatian media regards future of Peljesac Bridge, the important infrastructure object that was supposed to be built to connect Croatian Mainland and Peljesac Peninsula.

Peljesac Bridge evaluation study

A study to evaluate the effects of construction of Peljesac Bridge in the context of economic, transport and demographic changes of Peljesac Peninsula , Korcula , Mljet and its surrounding area, has been presented today at Hotel Villa Argentina in Dubrovnik, Croatia.

Peljesac Bridge construction works formally opened

Last week, Croatian Prime Minister Ivo Sanader marked the formal start of construction work on a Peljesac Bridge, saying that the bridge would provide a link between the southernmost part of Croatia and the rest of the country and revitalise Peljesac Peninsula and nearby islands, including Korcula, Mljet and Lastovo.

The Quality of Sea at Korcula Beaches

Since 1989, the sea quality of Croatian beaches are monitored by relevant Government agency?adequately sampling and analysing samples of sea water around the Adriatic Coast.

Bosnia threatens to sue Croatia

The latest news about Peljesac Bridge development are following:

Peljesac Bridge public tender announced

The public tender for Peljesac Bridge has been announced.
Hrvatske Autoceste are looking for offer from construction companies to build the the bridge which cost is expected to be about 260 milion euros.

Grand Hotel Orebic

The largest and well known Hotel “Rathaneum” in Orebic was reopened last weekend under ther new name  - “The Grand Hotel Orebic”.

Pages (6): [1] 2 3 4 5 6 »